Ubiquiti UNIFI AC AP COMPACT 4X4 MU MIMO WAVE2 ENT. 5PK(LONG LEAD TIME) UAP-NANOHD-5-US
Original price was: $875.00.$763.00Current price is: $763.00.
UNIFI AC AP COMPACT 4X4 MU MIMO WAVE2 ENT. 5PK(LONG LEAD TIME)
Description
Ubiquiti UniFi nanoHD UAP-NANOHD IEEE 802.11ac 1.70 Gbit/s Wireless Access Point – 2.40 GHz, 5 GHz – MIMO Technology – 1 x Network (RJ-45) – Wall Mountable, Ceiling Mountable – 5
Features
- Four-Stream 802.11ac Wave 2 Technology
- Supports 200+ Concurrent Users
- 802.3af PoE Compatibility
Tech Specs
| Basic | |
|---|---|
| Product Type | Wireless Access Point |
| Form Factor | Wall Mountable |
| Form Factor | Ceiling Mountable |
| Wireless Transmission Speed | 1.70 Gbit/s |
| Brand Name | Ubiquiti |
| Frequency Band | 5 GHz |
| Frequency Band | 2.40 GHz |
| Wireless LAN Standard | IEEE 802.11ac |
| Ethernet Technology | Gigabit Ethernet |
| USB | No |
| Number of Network (RJ-45) Ports | 1 |
| Product Family | UniFi nanoHD |
| PoE (RJ-45) Port | No |
| General Information | |
| Product Type | Wireless Access Point |
| Manufacturer Part Number | UAP-NANOHD-5-US |
| Manufacturer Website Address | http://www.ui.com |
| Packaged Quantity | 5 |
| Manufacturer | Ubiquiti Inc. |
| Product Model | UAP-NANOHD |
| Product Name | 4×4 MU-MIMO 802.11ac Wave 2 Access Point |
| Product Line | UniFi nanoHD |
| Brand Name | Ubiquiti |
| Interfaces/Ports | |
| Ethernet Technology | Gigabit Ethernet |
| USB | No |
| HDMI | No |
| VGA | No |
| Number of Network (RJ-45) Ports | 1 |
| Powerline | No |
| Management Port | No |
| PoE (RJ-45) Port | No |
| Miscellaneous | |
| Package Contents |
|
| Physical Characteristics | |
| Weight (Approximate) | 10.58 oz |
| Form Factor | Ceiling Mountable |
| Form Factor | Wall Mountable |
| Diameter | 6.3″ |
| Height | 1.3″ |
| Width | 6.3″ |
| Technical Information | |
| Wireless Transmission Speed | 1.70 Gbit/s |
| Frequency Band | 5 GHz |
| Frequency Band | 2.40 GHz |
| Wireless LAN Standard | IEEE 802.11ac |
| MIMO Technology | Yes |













Reviews
There are no reviews yet.